This device was built as a UK industry response to the Macondo incident and is available for use by operators in an emergency in the UKCS. The capping device, which is now located in Aberdeen, was designed and built with the benefit of the lessons learned by BP during the Gulf incident. The device weighs around 40 tons and is capable of rapid deployment in water depths up to 10,000 feet.